Laying Stepping Stones

 

  • Place the stepping-stones along the lawn, not spacing them to far from one another.
  • Using the stepping-stone as a template, cut away the surrounding turf to a depth of approximately 75mm.
  • Fill the area with a sharp sand to the depth of 30 - 35mm or use a weak semi dry mix of 5 parts sand and 1 part cement.
  • Place the stepping-stone where the turf has been removed and tap down gently with a rubber mallet so that it sits just below the level of the lawn.